Step 1: Contextual Framework Pass (Facts)
Extract roles, states, and resources from the facts section
Selection of Firm—Promise of Future Engineering Work on a Public Project
Step 1 of 5
Facts Section
Section Content:
Facts: Engineer A is a principal in a medium-sized engineering firm with expertise in mechanical and electrical engineering. Engineer A’s firm is retained on a speculative basis by Engineer B, a local civil engineer, to assist City X in applying for a federal grant for certain wastewater treatment equipment upgrades for the city’s wastewater treatment facility. The application is successful, City X obtains the grant, and Engineer B is retained to design the waste water equipment upgrades. In recognition of Engineer A’s work in securing the grant, Engineer C, the chief city engineer, verbally promises to select Engineer A’s firm on a future engineering project for City X.