Misrepresentation - Changes Made to Engineer’s Report
Case 111
Source
Document Structure
4
Sections4/4
With Embeddings100%
Coverage384D
Dimensions
Embeddings use 384D local model for precedent matching
Document Sections
Content Length
337 chars
HTML Length
337 chars
Plain Text Length
337 chars
Embedding Dimension
384
Compatible
Created
2026-02-13 16:13
Updated
2026-02-13 16:13
Content Preview
Engineer A has an obligation to seek an understanding of his company’s actions and, if there is an effort to misrepresent the conclusion contained in Engineer A’s report, to seek an immediate correction by contacting appropriate authorities, including the state engineering licensure board and other enforcement officials as appropriate.
Content Length
7003 chars
HTML Length
7224 chars
Plain Text Length
7001 chars
Embedding Dimension
384
Compatible
Created
2026-02-13 16:13
Updated
2026-03-02 23:20
Content Preview
Performing an inspection and assessment of property is one of the most fundamental activities of a professional engineer. Members of the public call upon professional engineers to perform these duties because of the technical knowledge and skill the professional engineer can provide for the benefit of the client.
On different occasions t he NSPE Board of Ethical Review has discussed the ethical responsibili ties of professional engineer s performing services after modifications or changes are made to their work.
In BER Case 86-2, the Chief Engineer within a large engineering firm affixed his seal to some of the plans prepared by licensed engineers working under his general direction who did not affix their seals to the plans. At times, the Chief Engineer also seals plans prepared by nonlicensed graduate engineers working under his general supervision. Because of the size of the organization and the large number of projects being designed at any one time, the Chief Engineer found it impossible to give a detailed review of the designs. The Chief Engineer believed he is ethically and legally correct in not doing so because of his confidence in the ability of thos e he has hired and who are working under his general direction and supervision. By general direction and supervision, the Chief Engineer meant that he was involved in helping to establish the concept, the design requirements, and review elements of the design or verifying the project status as the design process progresses. Chief Engineer was consulted about technical questions and he provided answers and direction in these matters. The Board concluded that it was unethical for the Chief Engineer to seal pl ans that have not been prepared by him, or that he had not checked and reviewed in detail.
More recently, in BER Case 09-6, two professional engineers with similar backgrounds and expertise in electrical engineering were assigned to the same project because of time constraints and other factors, but were...
Content Length
1714 chars
HTML Length
1714 chars
Plain Text Length
1714 chars
Embedding Dimension
384
Compatible
Created
2026-02-13 16:13
Updated
2026-02-13 16:13
Content Preview
Engineer A, a licensed professional engineer, is employed by engineering firm XYZ Engineering. The firm was hired by a property insurance company to inspect and conduct structural assessments of residential properties damaged by a recent hurricane and to determine whether the damage was hurricane-related (a claim covered by insurance) or due to a pre-existing structural condition (a claim not covered by insurance). Engineer A visits the residential properties and, following his inspection and structural assessment, prepares a series of reports for XYZ Engineering. The majority indicate that the damage was in fact hurricane-related. He then signs and seals the reports. Supervisor B, one of the principals of XYZ Engineering and not a professional engineer, reviews the reports and asks Engineer A to make changes to some of the reports to indicate that the residential property damage was not hurricane-related but due to a pre-existing structural condition. Finding no factual or technical basis for the requested change, Engineer A refuses to make the changes. Supervisor B takes the reports and thereafter sends them to the client, the property insurance company. Later Engineer A hears from residential property owners whose homes he had inspected and noted in his signed and sealed report to be damaged by hurricanes. Those residential property owners advise Engineer A that their property insurance damage claims were denied because the signed and sealed report by Engineer A indicated that the residential property damage was due to a pre-existing structural condition. There is no supplemental technical or other information to indicate any basis for the apparent alteration of Engineer A’s report.
Content Length
58 chars
HTML Length
58 chars
Plain Text Length
58 chars
Embedding Dimension
384
Compatible
Created
2026-02-13 16:13
Updated
2026-02-13 16:13
Content Preview
What are Engineer A’s obligations under the circumstances?
Similar Cases
Find cases with similar D-tuple components, provisions, and tags.
Find Similar CasesD-tuple Component Breakdown
45
Total Entities9/9
Components Populated9/9
With EmbeddingsCombined Embedding
Roles
R
w=0.12
384D
XYZ Engineering Employer
Engineering firm that employs Engineer A and whose principal, Supervisor B, requested changes to Engineer A's...
Engineer A Inspector Engineer
Inspected hurricane-damaged residential properties, prepared, signed and sealed reports finding most damage...
Supervisor B Firm Principal Supervisor
Principal of XYZ Engineering who is not a professional engineer. Reviewed Engineer A's reports, asked Engineer A to...
XYZ Engineering Provider
Hired by the property insurance company to inspect and conduct structural assessments of hurricane-damaged...
Property Insurance Company Client
Hired XYZ Engineering to determine whether residential property damage was hurricane-related or pre-existing,...
Residential Property Owners
Owners of hurricane-damaged homes inspected by Engineer A whose insurance claims were denied based on apparently...
NSPE Board of Ethical Review
Reviews the present case in light of prior BER opinions, reasons that any modification of signed and sealed...
7 entities
Principles
P
w=0.2
384D
Honesty in Correcting Misrepresented Findings
The Board states that Engineer A should require immediate correction if there is an effort to misrepresent the...
Fact-Based Reporting in Hurricane Inspections
Engineer A refuses Supervisor B's request to change signed and sealed inspection reports to indicate pre-existing...
Sealed Document Integrity in Report Alteration
The Board finds that the signing and sealing process for Engineer A's inspection reports appears to have been...
3 entities
Obligations
O
w=0.15
384D
Engineer A Findings Inquiry Duty
Engineer A must take necessary steps to seek understanding as to the apparent reversing of his signed and sealed...
Engineer A Correction Requirement Duty
If no other information is available that would alter Engineer A's findings, Engineer A should require immediate...
Engineer A Truthful Reporting Duty
Engineer A must prepare, sign, and seal inspection reports that reflect his actual factual and technical findings,...
XYZ Engineering Faithful Agent Duty
XYZ Engineering must perform the engaged inspection and structural assessment services for the property insurance...
4 entities
States
S
w=0.1
384D
No Basis For Change Knowledge
Signed Sealed Hurricane Reports
Unknown Motive Behind Report Alteration
Non-Engineer Authority Circumvention
Alteration Discovery By Engineer A
Supervisor B Change Directive
Homeowner Claim Denial Harm
Altered Reports Sent To Client
8 entities
Resources
Rs
w=0.1
384D
Engineer A Structural Assessment Reports
whether residential property damage was hurricane-related or due to a pre-existing structural condition
BER Case 86-2
BER Case 86-2 (topic: sealing plans not prepared or checked and reviewed in detail by the sealing engineer)
BER Case 09-6
BER Case 09-6 (topic: an engineer making changes to design documents prepared and sealed by another engineer without...
NSPE Code of Ethics
NSPE Code of Ethics (topic: ethical conduct and professional responsibilities of engineers, including signing and...
4 entities
Actions
A
w=0.1
384D
Refusal to Alter Reports
Inspection and Assessment
Report Signing and Sealing
Report Change Request
Report Transmission
Unauthorized Report Alteration
6 entities
Events
E
w=0.08
384D
Insurance Claim Denial
Hurricane Damage
Alteration Discovery
Sealing Process Compromised
4 entities
Capabilities
Ca
w=0.07
384D
Engineer A Objectivity Maintenance
Engineer A maintained independent professional judgment under pressure from Supervisor B, a firm principal, holding...
Engineer A Report Sealing
As a licensed professional engineer, Engineer A exercised sealing authority by signing and sealing the inspection...
Engineer A Corrective Action Pursuit
The Board holds that Engineer A must take necessary steps to seek understanding as to the apparent reversing of his...
Engineer A Structural Inspection
Engineer A visited the hurricane-damaged residential properties, conducted inspections and structural assessments,...
Engineer A Work Refusal Judgment
Engineer A judged that professional duty required declining Supervisor B's request to change report conclusions,...
5 entities
Constraints
Cs
w=0.08
384D
Engineer A Baseless Report Change Bar
Engineer A must not change the conclusions of his signed and sealed inspection reports to indicate that the...
XYZ Engineering Deceptive Report Delivery Bar
XYZ Engineering must not deliver to the property insurance company inspection reports under Engineer A's signature...
Supervisor B Sealed Report Modification Bar
No party who did not actually draft Engineer A's signed and sealed inspection reports or exercise responsible charge...
Supervisor B Sealed Report Alteration Bar
Supervisor B must not alter, or cause the alteration of, Engineer A's signed and sealed inspection reports so that...
4 entities
Embeddings: all-MiniLM-L6-v2 (384D, local) | Storage: pgvector (PostgreSQL) | Used for section and component similarity matching