Obligation-Conflict Resolution

Case 01-11 (2001) · Conflict Of Interest—Consultant Serving As City Engineer

Professional obligations conflict, and the board applies no fixed rule for which one wins. Each resolution is recorded as three edges: competesWith (the tension), prevailsOver (the obligation the board allowed to win in this case), and defeasibleUnder (the situation under which the yielding obligation gives way). The same tension is then traced across comparable cases, where its resolution shifts with context. Hover any obligation or state to see its definition; click to open it in OntServe.
How this case resolved it
Featured
Engineer A Structural Conflict Proactive Disclosure to City H Instance prevails over Engineer A WXY Prospective City Engineer Self-Interest Advisory Non-Distortion Instance
No State context committed for this edge.
Engineer A WXY Engineering Conflict of Interest Disclosure Evolution Compliance prevails over WXY Engineers Incumbent Multi-Contract City Engineer Non-Acceptance Obligation Instance
the two obligations are in tension (competesWith)
the yielding obligation gives way only under (defeasibleUnder):
  • Small Municipality Consulting Firm Appointment - BER 74-2
  • WXY Engineering Conditional Ethical Permissibility - Present Case
  • WXY No Private Work Conflict Negation - Present Case
Engineer A WXY Engineering Small Municipality Public Interest Dual Role Justification prevails over WXY Engineers Incumbent Multi-Contract City Engineer Non-Acceptance Obligation Instance
the two obligations are in tension (competesWith)
the yielding obligation gives way only under (defeasibleUnder):
  • Small Municipality Consulting Firm Appointment - BER 74-2
  • WXY Engineering Conditional Ethical Permissibility - Present Case
  • WXY No Private Work Conflict Negation - Present Case
Engineer A WXY Engineering Prospective Evolving Conflict Ongoing Disclosure prevails over WXY Engineers Incumbent Multi-Contract City Engineer Non-Acceptance Obligation Instance
the yielding obligation gives way only under (defeasibleUnder):
  • Small Municipality Consulting Firm Appointment - BER 74-2
  • WXY Engineering Conditional Ethical Permissibility - Present Case
  • WXY No Private Work Conflict Negation - Present Case
Engineer A WXY Engineering Self-Review Non-Performance Structural Boundary prevails over Engineer A WXY Engineering Faithful Agent City H Advisory Role
No State context committed for this edge.
Open tensions recorded without a resolution: Engineer A Small Municipality Engineering Service Access Public Welfare Facilitation Instance vs WXY Engineers Incumbent Multi-Contract City Engineer Non-Acceptance Obligation Instance Engineer A Structural Conflict Proactive Disclosure to City H Instance vs Engineer A WXY Engineering Faithful Agent City H Advisory Role Engineer A WXY Engineering Faithful Agent City H Advisory Role vs Engineer A WXY Prospective City Engineer Self-Interest Advisory Non-Distortion Instance Engineer A WXY Engineering Self-Review Non-Performance Structural Boundary vs Engineer A WXY Engineering Small Municipality Public Interest Dual Role Justification Engineer A WXY Engineering Self-Review Non-Performance Structural Boundary vs Engineer B BER 63-5 Client Self-Review Waiver Recognition WXY Engineers Incumbent Multi-Contract City Engineer Non-Acceptance Obligation Instance vs WXY Engineers Part-Time Municipal Engineer Dual-Role Permissibility Boundary Assessment Instance WXY Engineers Incumbent Multi-Contract City Engineer Non-Acceptance Obligation Instance vs WXY Private-Client Absence Partial Mitigation Residual Conflict Assessment Instance
What the board concluded
  • It would be ethical for Engineer A’s firm, WXY Engineers, to serve as city engineer for City H, perform general consulting services, and be under contract to provide specific design services.
How comparable cases resolved the same tension

A faithful-agent duty yields to a public-protection obligation. The yielding obligation ("Faithful Agent") recurs across cases; the obligation that overrides it and the context under which it yields differ case by case. This is the case-law move: not a single rule, but a family of context-indexed resolutions.

Case Obligation that prevailed Yielding obligation Context (defeasibleUnder)
24-01
Balancing Client Directives and Public...
Engineer L Client Budget Pressure Refusal Engineer L Faithful Agent Boundary Engineer L Confirmed Risk Without Safeguards; Engineer L Resource Constrained Client
Engineer L Client Override Regulatory Report Engineer L Faithful Agent Boundary Engineer L Confirmed Risk Without Safeguards; Engineer L Resource Constrained Client
20-4
Public Health, Safety, and...
Engineer B Post-Override Regulatory Reporting Engineer B Faithful Agent Boundary MWC Override of Engineers A and B
Engineer A Post-Override Regulatory Reporting Engineer A Faithful Agent Boundary MWC Override of Engineers A and B
95-5
Failure To Include Information In...
Engineer B Expert Witness Neutrality Engineer B Faithful Agent Boundary Engineer B Adversarial Engagement; Engineer B Client Defense Bias
Engineer B Complete Technical Reporting Engineer B Faithful Agent Boundary Engineer B Adversarial Engagement; Engineer B Client Defense Bias
04-8
Public Welfare—Client Action Following...
Engineer A Safety Obligation Wetland Fill Engineer A Faithful Agent Limits Wetland Engineer A Confirmed Environmental Risk; Engineer A Faithful Agent Duty Conflict
Engineer A Wetland Confidentiality Limits Engineer A Faithful Agent Limits Wetland Engineer A Confirmed Environmental Risk; Engineer A Faithful Agent Duty Conflict