PASS 3: Temporal Dynamics
Case 103: Conflict of Interest - Part-Time Service as City Engineer
Timeline Overview
OWL-Time Temporal Structure 7 relations time: = w3.org/2006/time
Extracted Actions (7)
Volitional professional decisions with intentions and ethical contextDescription: The professional engineer, engaged in full-time private practice, accepts part-time retention by the small community to serve as city engineer, advising the council, offering recommendations, and approving plans.
Temporal Marker: Outset of the engagement, initial arrangement interval
Fluent Transitions:
- Part-Time City Engineer Retention
Mental State: deliberate
Intended Outcome: Provide ongoing engineering advisory and approval services to the community alongside his private practice
Foreseen Unintended Effects:
- Potential future situations of passing on his own work if retained for city projects
Guided By Principles:
- Undivided Loyalty
Required Capabilities:
Field classification (triples vs literals)
guidedByPrinciple: Undivided LoyaltyrequiresCapability: Engineering advisory judgment; Plan review and approval competenceinitiates: Part-Time City Engineer Retention
descriptioncontent: The professional engineer, engaged in full-time private practice, accepts part-time retention by the small community to serve as city engineer, advising the council, offering recommendations, and approving plans.hasAgentcontent: City EngineertemporalMarkercontent: Outset of the engagement, initial arrangementeventRoleContextcontent: City Engineer, private practitionerhasMentalStatecontent: deliberateintendedOutcomecontent: Provide ongoing engineering advisory and approval services to the community alongside his private practiceforeseenUnintendedEffectscontent: Potential future situations of passing on his own work if retained for city projectstextReferencescontent: A small community retains a professional engineer on a part-time basis to serve as city engineer.; The duties for the city usually include advising the city council on engineering problems, offering recommendations on engineering project considerations and approving plans for engineering processes and works.temporalExtentcontent: intervaltemporalSequencecontent: 1withinCompetenceassessment: True
RDF JSON-LD
{
"@context": {
"proeth": "http://proethica.org/ontology/intermediate#",
"proeth-case": "http://proethica.org/ontology/case/103#",
"rdf": "http://www.w3.org/1999/02/22-rdf-syntax-ns#",
"rdfs": "http://www.w3.org/2000/01/rdf-schema#",
"time": "http://www.w3.org/2006/time#"
},
"@id": "http://proethica.org/ontology/case/103#Action_Part-Time_Retention_Acceptance",
"@type": "proeth:Action",
"proeth:description": "The professional engineer, engaged in full-time private practice, accepts part-time retention by the small community to serve as city engineer, advising the council, offering recommendations, and approving plans.",
"proeth:eventRoleContext": "City Engineer, private practitioner",
"proeth:foreseenUnintendedEffects": [
"Potential future situations of passing on his own work if retained for city projects"
],
"proeth:guidedByPrinciple": [
"Undivided Loyalty"
],
"proeth:hasAgent": "City Engineer",
"proeth:hasMentalState": "deliberate",
"proeth:initiates": [
"Part-Time City Engineer Retention"
],
"proeth:intendedOutcome": "Provide ongoing engineering advisory and approval services to the community alongside his private practice",
"proeth:requiresCapability": [
"Engineering advisory judgment",
"Plan review and approval competence"
],
"proeth:temporalExtent": "interval",
"proeth:temporalMarker": "Outset of the engagement, initial arrangement",
"proeth:temporalSequence": 1,
"proeth:textReferences": [
"A small community retains a professional engineer on a part-time basis to serve as city engineer.",
"The duties for the city usually include advising the city council on engineering problems, offering recommendations on engineering project considerations and approving plans for engineering processes and works."
],
"proeth:withinCompetence": true,
"rdfs:label": "Part-Time Retention Acceptance"
}
Description: The engineer chooses to treat his part-time service to the community as service to a client rather than as salaried employment, which shapes how the Canons and Rules apply to the arrangement.
Temporal Marker: At the outset of the engagement instant
Fluent Transitions:
- Consultant-Client Relationship
Mental State: deliberate
Intended Outcome: Maintain a consultant-client relationship with the city consistent with his private practice
Required Capabilities:
Field classification (triples vs literals)
requiresCapability: Understanding of professional engagement structuresinitiates: Consultant-Client Relationship
descriptioncontent: The engineer chooses to treat his part-time service to the community as service to a client rather than as salaried employment, which shapes how the Canons and Rules apply to the arrangement.hasAgentcontent: City EngineertemporalMarkercontent: At the outset of the engagementeventRoleContextcontent: City Engineer, private practitionerhasMentalStatecontent: deliberateintendedOutcomecontent: Maintain a consultant-client relationship with the city consistent with his private practicetextReferencescontent: The professional engineer holding this position is engaged in full-time private practice and treats his part-time service to the community as service to a client.temporalExtentcontent: instanttemporalSequencecontent: 2withinCompetenceassessment: True
RDF JSON-LD
{
"@context": {
"proeth": "http://proethica.org/ontology/intermediate#",
"proeth-case": "http://proethica.org/ontology/case/103#",
"rdf": "http://www.w3.org/1999/02/22-rdf-syntax-ns#",
"rdfs": "http://www.w3.org/2000/01/rdf-schema#",
"time": "http://www.w3.org/2006/time#"
},
"@id": "http://proethica.org/ontology/case/103#Action_Client_Service_Framing",
"@type": "proeth:Action",
"proeth:description": "The engineer chooses to treat his part-time service to the community as service to a client rather than as salaried employment, which shapes how the Canons and Rules apply to the arrangement.",
"proeth:eventRoleContext": "City Engineer, private practitioner",
"proeth:hasAgent": "City Engineer",
"proeth:hasMentalState": "deliberate",
"proeth:initiates": [
"Consultant-Client Relationship"
],
"proeth:intendedOutcome": "Maintain a consultant-client relationship with the city consistent with his private practice",
"proeth:requiresCapability": [
"Understanding of professional engagement structures"
],
"proeth:temporalExtent": "instant",
"proeth:temporalMarker": "At the outset of the engagement",
"proeth:temporalSequence": 2,
"proeth:textReferences": [
"The professional engineer holding this position is engaged in full-time private practice and treats his part-time service to the community as service to a client."
],
"proeth:withinCompetence": true,
"rdfs:label": "Client Service Framing"
}
Description: In his ongoing city engineer capacity, the engineer advises the city council and recommends approval of projects, including projects for which the council may then retain him for design, requiring him to avoid prejudicing his advice for personal gain.
Temporal Marker: Continuing, at each recommendation to the city council interval
Mental State: deliberate
Intended Outcome: Provide sound engineering guidance to the city council on projects under consideration
Foreseen Unintended Effects:
- Approval by the city council may lead to his securing a commission for that project
Obligation Engagement:
- Duty to Avoid Prejudicing Advice (Rule 13)
Guided By Principles:
- Undivided Loyalty
Required Capabilities:
Field classification (triples vs literals)
fulfillsObligation: Duty to Avoid Prejudicing Advice (Rule 13)guidedByPrinciple: Undivided LoyaltyrequiresCapability: Engineering advisory judgment; Objective project evaluation
descriptioncontent: In his ongoing city engineer capacity, the engineer advises the city council and recommends approval of projects, including projects for which the council may then retain him for design, requiring him to avoid prejudicing his advice for personal gain.hasAgentcontent: City EngineertemporalMarkercontent: Continuing, at each recommendation to the city councileventRoleContextcontent: City Engineer, private practitionerhasMentalStatecontent: deliberateintendedOutcomecontent: Provide sound engineering guidance to the city council on projects under considerationforeseenUnintendedEffectscontent: Approval by the city council may lead to his securing a commission for that projecttextReferencescontent: the engineer has a duty because of his dual capacity to avoid prejudicing his advice to the city on the project under consideration because its approval by the city council may lead to his securing a commission for that project; an engineer in these circumstances should be doubly careful in studying and recommending approval of a project for which the city council must look to him for guidancetemporalExtentcontent: intervaltemporalSequencecontent: 3withinCompetenceassessment: True
RDF JSON-LD
{
"@context": {
"proeth": "http://proethica.org/ontology/intermediate#",
"proeth-case": "http://proethica.org/ontology/case/103#",
"rdf": "http://www.w3.org/1999/02/22-rdf-syntax-ns#",
"rdfs": "http://www.w3.org/2000/01/rdf-schema#",
"time": "http://www.w3.org/2006/time#"
},
"@id": "http://proethica.org/ontology/case/103#Action_Advisory_Recommendation",
"@type": "proeth:Action",
"proeth:description": "In his ongoing city engineer capacity, the engineer advises the city council and recommends approval of projects, including projects for which the council may then retain him for design, requiring him to avoid prejudicing his advice for personal gain.",
"proeth:eventRoleContext": "City Engineer, private practitioner",
"proeth:foreseenUnintendedEffects": [
"Approval by the city council may lead to his securing a commission for that project"
],
"proeth:fulfillsObligation": [
"Duty to Avoid Prejudicing Advice (Rule 13)"
],
"proeth:guidedByPrinciple": [
"Undivided Loyalty"
],
"proeth:hasAgent": "City Engineer",
"proeth:hasMentalState": "deliberate",
"proeth:intendedOutcome": "Provide sound engineering guidance to the city council on projects under consideration",
"proeth:raisesObligation": [],
"proeth:requiresCapability": [
"Engineering advisory judgment",
"Objective project evaluation"
],
"proeth:temporalExtent": "interval",
"proeth:temporalMarker": "Continuing, at each recommendation to the city council",
"proeth:temporalSequence": 3,
"proeth:textReferences": [
"the engineer has a duty because of his dual capacity to avoid prejudicing his advice to the city on the project under consideration because its approval by the city council may lead to his securing a commission for that project",
"an engineer in these circumstances should be doubly careful in studying and recommending approval of a project for which the city council must look to him for guidance"
],
"proeth:violatesObligation": [],
"proeth:withinCompetence": true,
"rdfs:label": "Advisory Recommendation"
}
Description: The city council additionally retains the same engineer for the preparation of plans and specifications for a city project, compensating him on a normal professional fee basis above his monthly retainer.
Temporal Marker: Recurring, after the initial part-time retention, when specific city projects arise instant
Fluent Transitions:
- Dual Capacity
Mental State: deliberate
Intended Outcome: Obtain plans and specifications for city projects from the engineer already familiar with the city's needs
Foreseen Unintended Effects:
- The engineer would pass on the adequacy of his own plans in his capacity as city engineer
Field classification (triples vs literals)
initiates: Dual Capacity
descriptioncontent: The city council additionally retains the same engineer for the preparation of plans and specifications for a city project, compensating him on a normal professional fee basis above his monthly retainer.hasAgentcontent: City CounciltemporalMarkercontent: Recurring, after the initial part-time retention, when specific city projects ariseeventRoleContextcontent: clienthasMentalStatecontent: deliberateintendedOutcomecontent: Obtain plans and specifications for city projects from the engineer already familiar with the city's needsforeseenUnintendedEffectscontent: The engineer would pass on the adequacy of his own plans in his capacity as city engineertextReferencescontent: the professional engineer may be retained by the city council for the preparation of plans and specifications for a city project. In such cases, he is compensated on a normal professional fee basis over and above his monthly retainer.temporalExtentcontent: instanttemporalSequencecontent: 5withinCompetenceassessment: True
RDF JSON-LD
{
"@context": {
"proeth": "http://proethica.org/ontology/intermediate#",
"proeth-case": "http://proethica.org/ontology/case/103#",
"rdf": "http://www.w3.org/1999/02/22-rdf-syntax-ns#",
"rdfs": "http://www.w3.org/2000/01/rdf-schema#",
"time": "http://www.w3.org/2006/time#"
},
"@id": "http://proethica.org/ontology/case/103#Action_Project_Commission_Retention",
"@type": "proeth:Action",
"proeth:description": "The city council additionally retains the same engineer for the preparation of plans and specifications for a city project, compensating him on a normal professional fee basis above his monthly retainer.",
"proeth:eventRoleContext": "client",
"proeth:foreseenUnintendedEffects": [
"The engineer would pass on the adequacy of his own plans in his capacity as city engineer"
],
"proeth:hasAgent": "City Council",
"proeth:hasMentalState": "deliberate",
"proeth:initiates": [
"Dual Capacity"
],
"proeth:intendedOutcome": "Obtain plans and specifications for city projects from the engineer already familiar with the city\u0027s needs",
"proeth:temporalExtent": "instant",
"proeth:temporalMarker": "Recurring, after the initial part-time retention, when specific city projects arise",
"proeth:temporalSequence": 5,
"proeth:textReferences": [
"the professional engineer may be retained by the city council for the preparation of plans and specifications for a city project. In such cases, he is compensated on a normal professional fee basis over and above his monthly retainer."
],
"proeth:withinCompetence": true,
"rdfs:label": "Project Commission Retention"
}
Description: The engineer accepts project design commissions from the same city he serves as reviewing and approving city engineer, placing himself in the position of passing on the adequacy of his own plans.
Temporal Marker: Recurring, whenever the city council retains him for a specific project interval
Fluent Transitions:
- Dual Capacity
- Self-Interest in Project Approval
Mental State: deliberate
Intended Outcome: Earn professional fees for design work beyond the monthly retainer
Foreseen Unintended Effects:
- Passing engineering judgment on his own plans in his city engineer capacity
- Approval of a project by the council may lead to his securing a commission for that project
Guided By Principles:
- Undivided Loyalty
Required Capabilities:
Field classification (triples vs literals)
guidedByPrinciple: Undivided LoyaltyrequiresCapability: Design of plans and specifications; Self-assessment of own workinitiates: Dual Capacity; Self-Interest in Project Approval
descriptioncontent: The engineer accepts project design commissions from the same city he serves as reviewing and approving city engineer, placing himself in the position of passing on the adequacy of his own plans.hasAgentcontent: City EngineertemporalMarkercontent: Recurring, whenever the city council retains him for a specific projecteventRoleContextcontent: City Engineer, private practitionerhasMentalStatecontent: deliberateintendedOutcomecontent: Earn professional fees for design work beyond the monthly retainerforeseenUnintendedEffectscontent: Passing engineering judgment on his own plans in his city engineer capacity; Approval of a project by the council may lead to his securing a commission for that projecttextReferencescontent: he is compensated on a normal professional fee basis over and above his monthly retainer; the engineer is acting in a dual capacity, but not a divided onetemporalExtentcontent: intervaltemporalSequencecontent: 6withinCompetenceassessment: True
RDF JSON-LD
{
"@context": {
"proeth": "http://proethica.org/ontology/intermediate#",
"proeth-case": "http://proethica.org/ontology/case/103#",
"rdf": "http://www.w3.org/1999/02/22-rdf-syntax-ns#",
"rdfs": "http://www.w3.org/2000/01/rdf-schema#",
"time": "http://www.w3.org/2006/time#"
},
"@id": "http://proethica.org/ontology/case/103#Action_Project_Commission_Acceptance",
"@type": "proeth:Action",
"proeth:description": "The engineer accepts project design commissions from the same city he serves as reviewing and approving city engineer, placing himself in the position of passing on the adequacy of his own plans.",
"proeth:eventRoleContext": "City Engineer, private practitioner",
"proeth:foreseenUnintendedEffects": [
"Passing engineering judgment on his own plans in his city engineer capacity",
"Approval of a project by the council may lead to his securing a commission for that project"
],
"proeth:guidedByPrinciple": [
"Undivided Loyalty"
],
"proeth:hasAgent": "City Engineer",
"proeth:hasMentalState": "deliberate",
"proeth:initiates": [
"Dual Capacity",
"Self-Interest in Project Approval"
],
"proeth:intendedOutcome": "Earn professional fees for design work beyond the monthly retainer",
"proeth:requiresCapability": [
"Design of plans and specifications",
"Self-assessment of own work"
],
"proeth:temporalExtent": "interval",
"proeth:temporalMarker": "Recurring, whenever the city council retains him for a specific project",
"proeth:temporalSequence": 6,
"proeth:textReferences": [
"he is compensated on a normal professional fee basis over and above his monthly retainer",
"the engineer is acting in a dual capacity, but not a divided one"
],
"proeth:withinCompetence": true,
"rdfs:label": "Project Commission Acceptance"
}
Description: The city implicitly waives its right to have the engineer's plans reviewed by another engineer employed or retained by the client, relying instead on the same engineer in his city engineer capacity.
Temporal Marker: Ongoing, inferred from the arrangement as it operates interval
Fluent Transitions:
- Independent Review Waived
Mental State: deliberate
Intended Outcome: Rely on its retained city engineer for plan review rather than engaging a separate reviewing engineer
Foreseen Unintended Effects:
- The engineer passes on the adequacy of his own plans
Field classification (triples vs literals)
initiates: Independent Review Waived
descriptioncontent: The city implicitly waives its right to have the engineer's plans reviewed by another engineer employed or retained by the client, relying instead on the same engineer in his city engineer capacity.hasAgentcontent: CitytemporalMarkercontent: Ongoing, inferred from the arrangement as it operateseventRoleContextcontent: client, through the city councilhasMentalStatecontent: deliberateintendedOutcomecontent: Rely on its retained city engineer for plan review rather than engaging a separate reviewing engineerforeseenUnintendedEffectscontent: The engineer passes on the adequacy of his own planstextReferencescontent: The client has such a right of review by its own engineer, but it may waive its right, as it has obviously done in this case.temporalExtentcontent: intervaltemporalSequencecontent: 9withinCompetenceassessment: True
RDF JSON-LD
{
"@context": {
"proeth": "http://proethica.org/ontology/intermediate#",
"proeth-case": "http://proethica.org/ontology/case/103#",
"rdf": "http://www.w3.org/1999/02/22-rdf-syntax-ns#",
"rdfs": "http://www.w3.org/2000/01/rdf-schema#",
"time": "http://www.w3.org/2006/time#"
},
"@id": "http://proethica.org/ontology/case/103#Action_Independent_Review_Waiver",
"@type": "proeth:Action",
"proeth:description": "The city implicitly waives its right to have the engineer\u0027s plans reviewed by another engineer employed or retained by the client, relying instead on the same engineer in his city engineer capacity.",
"proeth:eventRoleContext": "client, through the city council",
"proeth:foreseenUnintendedEffects": [
"The engineer passes on the adequacy of his own plans"
],
"proeth:hasAgent": "City",
"proeth:hasMentalState": "deliberate",
"proeth:initiates": [
"Independent Review Waived"
],
"proeth:intendedOutcome": "Rely on its retained city engineer for plan review rather than engaging a separate reviewing engineer",
"proeth:temporalExtent": "interval",
"proeth:temporalMarker": "Ongoing, inferred from the arrangement as it operates",
"proeth:temporalSequence": 9,
"proeth:textReferences": [
"The client has such a right of review by its own engineer, but it may waive its right, as it has obviously done in this case."
],
"proeth:withinCompetence": true,
"rdfs:label": "Independent Review Waiver"
}
Description: In his capacity as city engineer, the engineer passes on the adequacy of the plans he himself prepared as a retained consultant for city projects.
Temporal Marker: Recurring, when project plans he prepared come before him for approval interval
Fluent Transitions:
- Self-Review Condition
Mental State: deliberate
Intended Outcome: Fulfill his city engineer duty of approving plans for engineering processes and works
Foreseen Unintended Effects:
- Judging the adequacy of his own work without independent review
Guided By Principles:
- Undivided Loyalty
Required Capabilities:
Field classification (triples vs literals)
guidedByPrinciple: Undivided LoyaltyrequiresCapability: Plan review and approval competence; Impartial self-assessmentinitiates: Self-Review Condition
descriptioncontent: In his capacity as city engineer, the engineer passes on the adequacy of the plans he himself prepared as a retained consultant for city projects.hasAgentcontent: City EngineertemporalMarkercontent: Recurring, when project plans he prepared come before him for approvaleventRoleContextcontent: City Engineer, private practitionerhasMentalStatecontent: deliberateintendedOutcomecontent: Fulfill his city engineer duty of approving plans for engineering processes and worksforeseenUnintendedEffectscontent: Judging the adequacy of his own work without independent reviewtextReferencescontent: There is still left for decision, however, the practical question of the engineer passing on the adequacy of his own plans in his capacity as city engineer.temporalExtentcontent: intervaltemporalSequencecontent: 10withinCompetenceassessment: True
RDF JSON-LD
{
"@context": {
"proeth": "http://proethica.org/ontology/intermediate#",
"proeth-case": "http://proethica.org/ontology/case/103#",
"rdf": "http://www.w3.org/1999/02/22-rdf-syntax-ns#",
"rdfs": "http://www.w3.org/2000/01/rdf-schema#",
"time": "http://www.w3.org/2006/time#"
},
"@id": "http://proethica.org/ontology/case/103#Action_Own_Plan_Approval",
"@type": "proeth:Action",
"proeth:description": "In his capacity as city engineer, the engineer passes on the adequacy of the plans he himself prepared as a retained consultant for city projects.",
"proeth:eventRoleContext": "City Engineer, private practitioner",
"proeth:foreseenUnintendedEffects": [
"Judging the adequacy of his own work without independent review"
],
"proeth:guidedByPrinciple": [
"Undivided Loyalty"
],
"proeth:hasAgent": "City Engineer",
"proeth:hasMentalState": "deliberate",
"proeth:initiates": [
"Self-Review Condition"
],
"proeth:intendedOutcome": "Fulfill his city engineer duty of approving plans for engineering processes and works",
"proeth:requiresCapability": [
"Plan review and approval competence",
"Impartial self-assessment"
],
"proeth:temporalExtent": "interval",
"proeth:temporalMarker": "Recurring, when project plans he prepared come before him for approval",
"proeth:temporalSequence": 10,
"proeth:textReferences": [
"There is still left for decision, however, the practical question of the engineer passing on the adequacy of his own plans in his capacity as city engineer."
],
"proeth:withinCompetence": true,
"rdfs:label": "Own Plan Approval"
}
Extracted Events (3)
Occurrences that trigger ethical considerations and state changesDescription: Because the engineer advises the city council on projects whose approval may lead to his securing a design commission, a condition of potential self-interest in his advice arises whenever such a project is under consideration.
Temporal Marker: Whenever a project on which the engineer advises could result in a commission for him interval
Fluent Transitions:
- Potential Self-Interest State
Caused By Action: Action_Part-Time_Retention_Acceptance
Field classification (triples vs literals)
causedByAction: http://proethica.org/ontology/case/103#Action_Part-Time_Retention_Acceptanceinitiates: Potential Self-Interest State
descriptioncontent: Because the engineer advises the city council on projects whose approval may lead to his securing a design commission, a condition of potential self-interest in his advice arises whenever such a project is under consideration.temporalMarkercontent: Whenever a project on which the engineer advises could result in a commission for himtextReferencescontent: the engineer has a duty because of his dual capacity to avoid prejudicing his advice to the city on the project under consideration because its approval by the city council may lead to his securing a commission for that projecteventTypecontent: automatictemporalExtentcontent: intervaltemporalSequencecontent: 4confidenceassessment: 0.85
RDF JSON-LD
{
"@context": {
"proeth": "http://proethica.org/ontology/intermediate#",
"proeth-case": "http://proethica.org/ontology/case/103#",
"rdf": "http://www.w3.org/1999/02/22-rdf-syntax-ns#",
"rdfs": "http://www.w3.org/2000/01/rdf-schema#",
"time": "http://www.w3.org/2006/time#"
},
"@id": "http://proethica.org/ontology/case/103#Event_Self-Interest_Risk_Arising",
"@type": "proeth:Event",
"proeth:causedByAction": "http://proethica.org/ontology/case/103#Action_Part-Time_Retention_Acceptance",
"proeth:confidence": "0.85",
"proeth:description": "Because the engineer advises the city council on projects whose approval may lead to his securing a design commission, a condition of potential self-interest in his advice arises whenever such a project is under consideration.",
"proeth:eventType": "automatic",
"proeth:initiates": [
"Potential Self-Interest State"
],
"proeth:temporalExtent": "interval",
"proeth:temporalMarker": "Whenever a project on which the engineer advises could result in a commission for him",
"proeth:temporalSequence": 4,
"proeth:textReferences": [
"the engineer has a duty because of his dual capacity to avoid prejudicing his advice to the city on the project under consideration because its approval by the city council may lead to his securing a commission for that project"
],
"rdfs:label": "Self-Interest Risk Arising"
}
Description: When the engineer is retained for the preparation of plans and specifications for a city project, he is compensated on a normal professional fee basis over and above his monthly retainer, per the terms of the arrangement.
Temporal Marker: Following each project commission retention by the city council interval
Fluent Transitions:
- Additional Compensation State
Caused By Action: Action_Project_Commission_Retention
Field classification (triples vs literals)
causedByAction: http://proethica.org/ontology/case/103#Action_Project_Commission_Retentioninitiates: Additional Compensation State
descriptioncontent: When the engineer is retained for the preparation of plans and specifications for a city project, he is compensated on a normal professional fee basis over and above his monthly retainer, per the terms of the arrangement.temporalMarkercontent: Following each project commission retention by the city counciltextReferencescontent: In such cases, he is compensated on a normal professional fee basis over and above his monthly retainer.eventTypecontent: automatictemporalExtentcontent: intervaltemporalSequencecontent: 7confidenceassessment: 0.82
RDF JSON-LD
{
"@context": {
"proeth": "http://proethica.org/ontology/intermediate#",
"proeth-case": "http://proethica.org/ontology/case/103#",
"rdf": "http://www.w3.org/1999/02/22-rdf-syntax-ns#",
"rdfs": "http://www.w3.org/2000/01/rdf-schema#",
"time": "http://www.w3.org/2006/time#"
},
"@id": "http://proethica.org/ontology/case/103#Event_Fee_Compensation",
"@type": "proeth:Event",
"proeth:causedByAction": "http://proethica.org/ontology/case/103#Action_Project_Commission_Retention",
"proeth:confidence": "0.82",
"proeth:description": "When the engineer is retained for the preparation of plans and specifications for a city project, he is compensated on a normal professional fee basis over and above his monthly retainer, per the terms of the arrangement.",
"proeth:eventType": "automatic",
"proeth:initiates": [
"Additional Compensation State"
],
"proeth:temporalExtent": "interval",
"proeth:temporalMarker": "Following each project commission retention by the city council",
"proeth:temporalSequence": 7,
"proeth:textReferences": [
"In such cases, he is compensated on a normal professional fee basis over and above his monthly retainer."
],
"rdfs:label": "Fee Compensation"
}
Description: Once the engineer, already serving as part-time city engineer, is additionally retained to prepare plans and specifications for a city project, a dual capacity situation comes into being in which he passes on the adequacy of his own plans in his city engineer role.
Temporal Marker: Upon the engineer's acceptance of a project commission while serving as retained city engineer interval
Fluent Transitions:
- Dual Capacity State
- Self-Review Situation
Caused By Action: Action_Project_Commission_Acceptance
Field classification (triples vs literals)
causedByAction: http://proethica.org/ontology/case/103#Action_Project_Commission_Acceptanceinitiates: Dual Capacity State; Self-Review Situation
descriptioncontent: Once the engineer, already serving as part-time city engineer, is additionally retained to prepare plans and specifications for a city project, a dual capacity situation comes into being in which he passes on the adequacy of his own plans in his city engineer role.temporalMarkercontent: Upon the engineer's acceptance of a project commission while serving as retained city engineertextReferencescontent: There is still left for decision, however, the practical question of the engineer passing on the adequacy of his own plans in his capacity as city engineer.; Under these circumstances, the engineer is acting in a dual capacity, but not a divided one.eventTypecontent: automatictemporalExtentcontent: intervaltemporalSequencecontent: 8confidenceassessment: 0.9
RDF JSON-LD
{
"@context": {
"proeth": "http://proethica.org/ontology/intermediate#",
"proeth-case": "http://proethica.org/ontology/case/103#",
"rdf": "http://www.w3.org/1999/02/22-rdf-syntax-ns#",
"rdfs": "http://www.w3.org/2000/01/rdf-schema#",
"time": "http://www.w3.org/2006/time#"
},
"@id": "http://proethica.org/ontology/case/103#Event_Dual_Capacity_Arising",
"@type": "proeth:Event",
"proeth:causedByAction": "http://proethica.org/ontology/case/103#Action_Project_Commission_Acceptance",
"proeth:confidence": "0.9",
"proeth:description": "Once the engineer, already serving as part-time city engineer, is additionally retained to prepare plans and specifications for a city project, a dual capacity situation comes into being in which he passes on the adequacy of his own plans in his city engineer role.",
"proeth:eventType": "automatic",
"proeth:initiates": [
"Dual Capacity State",
"Self-Review Situation"
],
"proeth:temporalExtent": "interval",
"proeth:temporalMarker": "Upon the engineer\u0027s acceptance of a project commission while serving as retained city engineer",
"proeth:temporalSequence": 8,
"proeth:textReferences": [
"There is still left for decision, however, the practical question of the engineer passing on the adequacy of his own plans in his capacity as city engineer.",
"Under these circumstances, the engineer is acting in a dual capacity, but not a divided one."
],
"rdfs:label": "Dual Capacity Arising"
}
Causal Chains (6)
NESS test analysis: Necessary Element of Sufficient SetCausal Language: The duties for the city usually include advising the city council on engineering problems, offering recommendations on engineering project considerations and approving plans for engineering processes and works.
Necessary Factors (NESS):
- Engineer accepting the part-time city engineer position
- City delegating advisory and approval duties to the position
- Ongoing engineering matters requiring council guidance
Sufficient Factors:
- Acceptance of retention combined with the defined duties of advising and recommending to the council
Responsibility Attribution:
Agent: Professional Engineer
Type: direct
Within Agent Control:
Yes
Causal Sequence:
-
Part-Time Retention Acceptance
Engineer in full-time private practice accepts part-time retention as city engineer -
Client Service Framing
Engineer treats the community as a client of his private practice -
Advisory Recommendation
Engineer advises the council and recommends approval of engineering projects as part of his defined duties
Field classification (triples vs literals)
cause: Part-Time Retention Acceptanceeffect: Advisory RecommendationresponsibleAgent: Professional Engineer
causalLanguagecontent: The duties for the city usually include advising the city council on engineering problems, offering recommendations on engineering project considerations and approving plans for engineering processes and works.necessaryFactorscontent: Engineer accepting the part-time city engineer position; City delegating advisory and approval duties to the position; Ongoing engineering matters requiring council guidancesufficientFactorscontent: Acceptance of retention combined with the defined duties of advising and recommending to the councilcounterfactualcontent: Without accepting the part-time retention, the engineer would have no advisory role and would not be positioned to recommend project approvals to the city councilcausalSequencecontent: {'proeth:step': 1, 'proeth:element': 'Part-Time Retention Acceptance', 'proeth:description': 'Engineer in full-time private practice accepts part-time retention as city engineer'}; {'proeth:step': 2, 'proeth:element': 'Client Service Framing', 'proeth:description': 'Engineer treats the community as a client of his private practice'}; {'proeth:step': 3, 'proeth:element': 'Advisory Recommendation', 'proeth:description': 'Engineer advises the council and recommends approval of engineering projects as part of his defined duties'}responsibilityTypeassessment: directwithinAgentControlassessment: True
RDF JSON-LD
{
"@context": {
"proeth": "http://proethica.org/ontology/intermediate#",
"proeth-case": "http://proethica.org/ontology/case/103#",
"rdf": "http://www.w3.org/1999/02/22-rdf-syntax-ns#",
"rdfs": "http://www.w3.org/2000/01/rdf-schema#"
},
"@id": "http://proethica.org/ontology/case/103#CausalChain_1",
"@type": "proeth:CausalChain",
"proeth:causalLanguage": "The duties for the city usually include advising the city council on engineering problems, offering recommendations on engineering project considerations and approving plans for engineering processes and works.",
"proeth:causalSequence": [
{
"proeth:description": "Engineer in full-time private practice accepts part-time retention as city engineer",
"proeth:element": "Part-Time Retention Acceptance",
"proeth:step": 1
},
{
"proeth:description": "Engineer treats the community as a client of his private practice",
"proeth:element": "Client Service Framing",
"proeth:step": 2
},
{
"proeth:description": "Engineer advises the council and recommends approval of engineering projects as part of his defined duties",
"proeth:element": "Advisory Recommendation",
"proeth:step": 3
}
],
"proeth:cause": "Part-Time Retention Acceptance",
"proeth:counterfactual": "Without accepting the part-time retention, the engineer would have no advisory role and would not be positioned to recommend project approvals to the city council",
"proeth:discoveredInSection": "facts",
"proeth:effect": "Advisory Recommendation",
"proeth:necessaryFactors": [
"Engineer accepting the part-time city engineer position",
"City delegating advisory and approval duties to the position",
"Ongoing engineering matters requiring council guidance"
],
"proeth:responsibilityType": "direct",
"proeth:responsibleAgent": "Professional Engineer",
"proeth:sufficientFactors": [
"Acceptance of retention combined with the defined duties of advising and recommending to the council"
],
"proeth:withinAgentControl": true
}
Causal Language: In such cases, he is compensated on a normal professional fee basis over and above his monthly retainer.
Necessary Factors (NESS):
- City council decision to retain the engineer for plans and specifications
- Existence of a compensable city project
- Fee arrangement separate from the monthly retainer
Sufficient Factors:
- Council's retention of the engineer for project work under normal professional fee terms
Responsibility Attribution:
Agent: City Council
Type: shared
Within Agent Control:
Yes
Causal Sequence:
-
Project Commission Retention
City council retains the same engineer for preparation of plans and specifications for a city project -
Project Commission Acceptance
Engineer accepts the design commission from the city he serves -
Fee Compensation
Engineer is compensated on a normal professional fee basis over and above his monthly retainer
Field classification (triples vs literals)
cause: Project Commission Retentioneffect: Fee CompensationresponsibleAgent: City Council
causalLanguagecontent: In such cases, he is compensated on a normal professional fee basis over and above his monthly retainer.necessaryFactorscontent: City council decision to retain the engineer for plans and specifications; Existence of a compensable city project; Fee arrangement separate from the monthly retainersufficientFactorscontent: Council's retention of the engineer for project work under normal professional fee termscounterfactualcontent: Without the additional project retention, the engineer would receive only the monthly retainer and no professional fee for project designcausalSequencecontent: {'proeth:step': 1, 'proeth:element': 'Project Commission Retention', 'proeth:description': 'City council retains the same engineer for preparation of plans and specifications for a city project'}; {'proeth:step': 2, 'proeth:element': 'Project Commission Acceptance', 'proeth:description': 'Engineer accepts the design commission from the city he serves'}; {'proeth:step': 3, 'proeth:element': 'Fee Compensation', 'proeth:description': 'Engineer is compensated on a normal professional fee basis over and above his monthly retainer'}responsibilityTypeassessment: sharedwithinAgentControlassessment: True
RDF JSON-LD
{
"@context": {
"proeth": "http://proethica.org/ontology/intermediate#",
"proeth-case": "http://proethica.org/ontology/case/103#",
"rdf": "http://www.w3.org/1999/02/22-rdf-syntax-ns#",
"rdfs": "http://www.w3.org/2000/01/rdf-schema#"
},
"@id": "http://proethica.org/ontology/case/103#CausalChain_2",
"@type": "proeth:CausalChain",
"proeth:causalLanguage": "In such cases, he is compensated on a normal professional fee basis over and above his monthly retainer.",
"proeth:causalSequence": [
{
"proeth:description": "City council retains the same engineer for preparation of plans and specifications for a city project",
"proeth:element": "Project Commission Retention",
"proeth:step": 1
},
{
"proeth:description": "Engineer accepts the design commission from the city he serves",
"proeth:element": "Project Commission Acceptance",
"proeth:step": 2
},
{
"proeth:description": "Engineer is compensated on a normal professional fee basis over and above his monthly retainer",
"proeth:element": "Fee Compensation",
"proeth:step": 3
}
],
"proeth:cause": "Project Commission Retention",
"proeth:counterfactual": "Without the additional project retention, the engineer would receive only the monthly retainer and no professional fee for project design",
"proeth:discoveredInSection": "facts",
"proeth:effect": "Fee Compensation",
"proeth:necessaryFactors": [
"City council decision to retain the engineer for plans and specifications",
"Existence of a compensable city project",
"Fee arrangement separate from the monthly retainer"
],
"proeth:responsibilityType": "shared",
"proeth:responsibleAgent": "City Council",
"proeth:sufficientFactors": [
"Council\u0027s retention of the engineer for project work under normal professional fee terms"
],
"proeth:withinAgentControl": true
}
Causal Language: Under these circumstances, the engineer is acting in a dual capacity, but not a divided one.
Necessary Factors (NESS):
- Pre-existing role as part-time city engineer with review and approval duties
- Acceptance of the additional design commission from the same city
- Both roles serving the same single client
Sufficient Factors:
- Acceptance of the project commission while continuing to hold the city engineer position
Responsibility Attribution:
Agent: Professional Engineer
Type: shared
Within Agent Control:
Yes
Causal Sequence:
-
Part-Time Retention Acceptance
Engineer becomes part-time city engineer with approval duties -
Project Commission Retention
City council offers the same engineer the project design work -
Project Commission Acceptance
Engineer accepts the design commission while retaining the city engineer role -
Dual Capacity Arising
Engineer now serves simultaneously as designer and reviewing/approving city engineer
Field classification (triples vs literals)
cause: Project Commission Acceptanceeffect: Dual Capacity ArisingresponsibleAgent: Professional Engineer
causalLanguagecontent: Under these circumstances, the engineer is acting in a dual capacity, but not a divided one.necessaryFactorscontent: Pre-existing role as part-time city engineer with review and approval duties; Acceptance of the additional design commission from the same city; Both roles serving the same single clientsufficientFactorscontent: Acceptance of the project commission while continuing to hold the city engineer positioncounterfactualcontent: Had the engineer declined the design commission or resigned the advisory post, no dual capacity would existcausalSequencecontent: {'proeth:step': 1, 'proeth:element': 'Part-Time Retention Acceptance', 'proeth:description': 'Engineer becomes part-time city engineer with approval duties'}; {'proeth:step': 2, 'proeth:element': 'Project Commission Retention', 'proeth:description': 'City council offers the same engineer the project design work'}; {'proeth:step': 3, 'proeth:element': 'Project Commission Acceptance', 'proeth:description': 'Engineer accepts the design commission while retaining the city engineer role'}; {'proeth:step': 4, 'proeth:element': 'Dual Capacity Arising', 'proeth:description': 'Engineer now serves simultaneously as designer and reviewing/approving city engineer'}responsibilityTypeassessment: sharedwithinAgentControlassessment: True
RDF JSON-LD
{
"@context": {
"proeth": "http://proethica.org/ontology/intermediate#",
"proeth-case": "http://proethica.org/ontology/case/103#",
"rdf": "http://www.w3.org/1999/02/22-rdf-syntax-ns#",
"rdfs": "http://www.w3.org/2000/01/rdf-schema#"
},
"@id": "http://proethica.org/ontology/case/103#CausalChain_3",
"@type": "proeth:CausalChain",
"proeth:causalLanguage": "Under these circumstances, the engineer is acting in a dual capacity, but not a divided one.",
"proeth:causalSequence": [
{
"proeth:description": "Engineer becomes part-time city engineer with approval duties",
"proeth:element": "Part-Time Retention Acceptance",
"proeth:step": 1
},
{
"proeth:description": "City council offers the same engineer the project design work",
"proeth:element": "Project Commission Retention",
"proeth:step": 2
},
{
"proeth:description": "Engineer accepts the design commission while retaining the city engineer role",
"proeth:element": "Project Commission Acceptance",
"proeth:step": 3
},
{
"proeth:description": "Engineer now serves simultaneously as designer and reviewing/approving city engineer",
"proeth:element": "Dual Capacity Arising",
"proeth:step": 4
}
],
"proeth:cause": "Project Commission Acceptance",
"proeth:counterfactual": "Had the engineer declined the design commission or resigned the advisory post, no dual capacity would exist",
"proeth:discoveredInSection": "discussion",
"proeth:effect": "Dual Capacity Arising",
"proeth:necessaryFactors": [
"Pre-existing role as part-time city engineer with review and approval duties",
"Acceptance of the additional design commission from the same city",
"Both roles serving the same single client"
],
"proeth:responsibilityType": "shared",
"proeth:responsibleAgent": "Professional Engineer",
"proeth:sufficientFactors": [
"Acceptance of the project commission while continuing to hold the city engineer position"
],
"proeth:withinAgentControl": true
}
Causal Language: Rule 13 is binding in this case and the engineer has a duty because of his dual capacity to avoid prejudicing his advice to the city on the project under consideration because its approval by the city council may lead to his securing a commission for that project.
Necessary Factors (NESS):
- Dual capacity as advisor/reviewer and prospective project designer
- Financial fee compensation flowing from project commissions
- Council's reliance on the engineer's guidance for project approval
Sufficient Factors:
- Dual capacity combined with the prospect that project approval leads to a fee-bearing commission
Responsibility Attribution:
Agent: Professional Engineer
Type: direct
Within Agent Control:
Yes
Causal Sequence:
-
Dual Capacity Arising
Engineer holds both advisory/approval and design roles for the same city -
Advisory Recommendation
Engineer advises the council on projects whose approval could yield commissions for him -
Self-Interest Risk Arising
Risk emerges that his advice could be prejudiced by the prospect of securing the commission
Field classification (triples vs literals)
cause: Dual Capacity Arisingeffect: Self-Interest Risk ArisingresponsibleAgent: Professional Engineer
causalLanguagecontent: Rule 13 is binding in this case and the engineer has a duty because of his dual capacity to avoid prejudicing his advice to the city on the project under consideration because its approval by the city council may lead to his securing a commission for that project.necessaryFactorscontent: Dual capacity as advisor/reviewer and prospective project designer; Financial fee compensation flowing from project commissions; Council's reliance on the engineer's guidance for project approvalsufficientFactorscontent: Dual capacity combined with the prospect that project approval leads to a fee-bearing commissioncounterfactualcontent: Without the dual capacity, advice to the city could not benefit the engineer's own commission prospects and the self-interest risk would not arisecausalSequencecontent: {'proeth:step': 1, 'proeth:element': 'Dual Capacity Arising', 'proeth:description': 'Engineer holds both advisory/approval and design roles for the same city'}; {'proeth:step': 2, 'proeth:element': 'Advisory Recommendation', 'proeth:description': 'Engineer advises the council on projects whose approval could yield commissions for him'}; {'proeth:step': 3, 'proeth:element': 'Self-Interest Risk Arising', 'proeth:description': 'Risk emerges that his advice could be prejudiced by the prospect of securing the commission'}responsibilityTypeassessment: directwithinAgentControlassessment: True
RDF JSON-LD
{
"@context": {
"proeth": "http://proethica.org/ontology/intermediate#",
"proeth-case": "http://proethica.org/ontology/case/103#",
"rdf": "http://www.w3.org/1999/02/22-rdf-syntax-ns#",
"rdfs": "http://www.w3.org/2000/01/rdf-schema#"
},
"@id": "http://proethica.org/ontology/case/103#CausalChain_4",
"@type": "proeth:CausalChain",
"proeth:causalLanguage": "Rule 13 is binding in this case and the engineer has a duty because of his dual capacity to avoid prejudicing his advice to the city on the project under consideration because its approval by the city council may lead to his securing a commission for that project.",
"proeth:causalSequence": [
{
"proeth:description": "Engineer holds both advisory/approval and design roles for the same city",
"proeth:element": "Dual Capacity Arising",
"proeth:step": 1
},
{
"proeth:description": "Engineer advises the council on projects whose approval could yield commissions for him",
"proeth:element": "Advisory Recommendation",
"proeth:step": 2
},
{
"proeth:description": "Risk emerges that his advice could be prejudiced by the prospect of securing the commission",
"proeth:element": "Self-Interest Risk Arising",
"proeth:step": 3
}
],
"proeth:cause": "Dual Capacity Arising",
"proeth:counterfactual": "Without the dual capacity, advice to the city could not benefit the engineer\u0027s own commission prospects and the self-interest risk would not arise",
"proeth:discoveredInSection": "discussion",
"proeth:effect": "Self-Interest Risk Arising",
"proeth:necessaryFactors": [
"Dual capacity as advisor/reviewer and prospective project designer",
"Financial fee compensation flowing from project commissions",
"Council\u0027s reliance on the engineer\u0027s guidance for project approval"
],
"proeth:responsibilityType": "direct",
"proeth:responsibleAgent": "Professional Engineer",
"proeth:sufficientFactors": [
"Dual capacity combined with the prospect that project approval leads to a fee-bearing commission"
],
"proeth:withinAgentControl": true
}
Causal Language: The client has such a right of review by its own engineer, but it may waive its right, as it has obviously done in this case.
Necessary Factors (NESS):
- City's implicit waiver of independent engineering review
- Engineer's role as the city's approving engineer
- Engineer having prepared the plans under the project commission
Sufficient Factors:
- Waiver of review combined with the engineer's dual role as preparer and approver of plans
Responsibility Attribution:
Agent: City (client) and Professional Engineer
Type: shared
Within Agent Control:
Yes
Causal Sequence:
-
Project Commission Acceptance
Engineer prepares plans and specifications for the city project -
Independent Review Waiver
City waives its right to have the plans reviewed by another engineer -
Own Plan Approval
Engineer, as city engineer, passes on the adequacy of his own plans
Field classification (triples vs literals)
cause: Independent Review Waivereffect: Own Plan ApprovalresponsibleAgent: City (client) and Professional Engineer
causalLanguagecontent: The client has such a right of review by its own engineer, but it may waive its right, as it has obviously done in this case.necessaryFactorscontent: City's implicit waiver of independent engineering review; Engineer's role as the city's approving engineer; Engineer having prepared the plans under the project commissionsufficientFactorscontent: Waiver of review combined with the engineer's dual role as preparer and approver of planscounterfactualcontent: Had the city exercised its right to review by another engineer, the engineer would not pass on the adequacy of his own planscausalSequencecontent: {'proeth:step': 1, 'proeth:element': 'Project Commission Acceptance', 'proeth:description': 'Engineer prepares plans and specifications for the city project'}; {'proeth:step': 2, 'proeth:element': 'Independent Review Waiver', 'proeth:description': 'City waives its right to have the plans reviewed by another engineer'}; {'proeth:step': 3, 'proeth:element': 'Own Plan Approval', 'proeth:description': 'Engineer, as city engineer, passes on the adequacy of his own plans'}responsibilityTypeassessment: sharedwithinAgentControlassessment: True
RDF JSON-LD
{
"@context": {
"proeth": "http://proethica.org/ontology/intermediate#",
"proeth-case": "http://proethica.org/ontology/case/103#",
"rdf": "http://www.w3.org/1999/02/22-rdf-syntax-ns#",
"rdfs": "http://www.w3.org/2000/01/rdf-schema#"
},
"@id": "http://proethica.org/ontology/case/103#CausalChain_5",
"@type": "proeth:CausalChain",
"proeth:causalLanguage": "The client has such a right of review by its own engineer, but it may waive its right, as it has obviously done in this case.",
"proeth:causalSequence": [
{
"proeth:description": "Engineer prepares plans and specifications for the city project",
"proeth:element": "Project Commission Acceptance",
"proeth:step": 1
},
{
"proeth:description": "City waives its right to have the plans reviewed by another engineer",
"proeth:element": "Independent Review Waiver",
"proeth:step": 2
},
{
"proeth:description": "Engineer, as city engineer, passes on the adequacy of his own plans",
"proeth:element": "Own Plan Approval",
"proeth:step": 3
}
],
"proeth:cause": "Independent Review Waiver",
"proeth:counterfactual": "Had the city exercised its right to review by another engineer, the engineer would not pass on the adequacy of his own plans",
"proeth:discoveredInSection": "discussion",
"proeth:effect": "Own Plan Approval",
"proeth:necessaryFactors": [
"City\u0027s implicit waiver of independent engineering review",
"Engineer\u0027s role as the city\u0027s approving engineer",
"Engineer having prepared the plans under the project commission"
],
"proeth:responsibilityType": "shared",
"proeth:responsibleAgent": "City (client) and Professional Engineer",
"proeth:sufficientFactors": [
"Waiver of review combined with the engineer\u0027s dual role as preparer and approver of plans"
],
"proeth:withinAgentControl": true
}
Causal Language: we would caution that an engineer in these circumstances should be doubly careful in studying and recommending approval of a project for which the city council must look to him for guidance.
Necessary Factors (NESS):
- Engineer's act of advising and recommending project approval to the council
- Prospect that project approval leads to a design commission for the engineer
- Council's exclusive reliance on the engineer for guidance
Sufficient Factors:
- Recommendation of a project by the same engineer who stands to receive the resulting commission
Responsibility Attribution:
Agent: Professional Engineer
Type: direct
Within Agent Control:
Yes
Causal Sequence:
-
Advisory Recommendation
Engineer studies and recommends approval of a project to the city council -
Self-Interest Risk Arising
Because approval may lead to his securing the commission, a risk of prejudiced advice arises -
Project Commission Retention
Council, relying on his guidance, retains him for the approved project's design -
Fee Compensation
Engineer receives a professional fee over and above his retainer, completing the self-interest loop
Field classification (triples vs literals)
cause: Advisory Recommendationeffect: Self-Interest Risk ArisingresponsibleAgent: Professional Engineer
causalLanguagecontent: we would caution that an engineer in these circumstances should be doubly careful in studying and recommending approval of a project for which the city council must look to him for guidance.necessaryFactorscontent: Engineer's act of advising and recommending project approval to the council; Prospect that project approval leads to a design commission for the engineer; Council's exclusive reliance on the engineer for guidancesufficientFactorscontent: Recommendation of a project by the same engineer who stands to receive the resulting commissioncounterfactualcontent: If the engineer refrained from advising on projects he might later design, the specific risk of prejudiced advice would not materializecausalSequencecontent: {'proeth:step': 1, 'proeth:element': 'Advisory Recommendation', 'proeth:description': 'Engineer studies and recommends approval of a project to the city council'}; {'proeth:step': 2, 'proeth:element': 'Self-Interest Risk Arising', 'proeth:description': 'Because approval may lead to his securing the commission, a risk of prejudiced advice arises'}; {'proeth:step': 3, 'proeth:element': 'Project Commission Retention', 'proeth:description': "Council, relying on his guidance, retains him for the approved project's design"}; {'proeth:step': 4, 'proeth:element': 'Fee Compensation', 'proeth:description': 'Engineer receives a professional fee over and above his retainer, completing the self-interest loop'}responsibilityTypeassessment: directwithinAgentControlassessment: True
RDF JSON-LD
{
"@context": {
"proeth": "http://proethica.org/ontology/intermediate#",
"proeth-case": "http://proethica.org/ontology/case/103#",
"rdf": "http://www.w3.org/1999/02/22-rdf-syntax-ns#",
"rdfs": "http://www.w3.org/2000/01/rdf-schema#"
},
"@id": "http://proethica.org/ontology/case/103#CausalChain_6",
"@type": "proeth:CausalChain",
"proeth:causalLanguage": "we would caution that an engineer in these circumstances should be doubly careful in studying and recommending approval of a project for which the city council must look to him for guidance.",
"proeth:causalSequence": [
{
"proeth:description": "Engineer studies and recommends approval of a project to the city council",
"proeth:element": "Advisory Recommendation",
"proeth:step": 1
},
{
"proeth:description": "Because approval may lead to his securing the commission, a risk of prejudiced advice arises",
"proeth:element": "Self-Interest Risk Arising",
"proeth:step": 2
},
{
"proeth:description": "Council, relying on his guidance, retains him for the approved project\u0027s design",
"proeth:element": "Project Commission Retention",
"proeth:step": 3
},
{
"proeth:description": "Engineer receives a professional fee over and above his retainer, completing the self-interest loop",
"proeth:element": "Fee Compensation",
"proeth:step": 4
}
],
"proeth:cause": "Advisory Recommendation",
"proeth:counterfactual": "If the engineer refrained from advising on projects he might later design, the specific risk of prejudiced advice would not materialize",
"proeth:discoveredInSection": "discussion",
"proeth:effect": "Self-Interest Risk Arising",
"proeth:necessaryFactors": [
"Engineer\u0027s act of advising and recommending project approval to the council",
"Prospect that project approval leads to a design commission for the engineer",
"Council\u0027s exclusive reliance on the engineer for guidance"
],
"proeth:responsibilityType": "direct",
"proeth:responsibleAgent": "Professional Engineer",
"proeth:sufficientFactors": [
"Recommendation of a project by the same engineer who stands to receive the resulting commission"
],
"proeth:withinAgentControl": true
}
Allen Temporal Relations (7)
Interval algebra relationships with OWL-Time standard properties| From Entity | Allen Relation | To Entity | OWL-Time Property | Evidence |
|---|---|---|---|---|
| retention as part-time city engineer |
before
Entity1 is before Entity2 |
retention to prepare plans and specifications for a specific city project |
time:intervalBefore
http://www.w3.org/2006/time#intervalBefore |
A small community retains a professional engineer on a part-time basis to serve as city engineer... ... [more] |
| preparation of plans and specifications for specific projects |
during
Entity1 occurs entirely within the duration of Entity2 |
ongoing part-time city engineer retainer |
time:intervalDuring
http://www.w3.org/2006/time#intervalDuring |
he is compensated on a normal professional fee basis over and above his monthly retainer |
| full-time private practice |
overlaps
Entity1 starts before Entity2 and ends during Entity2 |
part-time service as city engineer |
time:intervalOverlaps
http://www.w3.org/2006/time#intervalOverlaps |
The professional engineer holding this position is engaged in full-time private practice and treats ... [more] |
| engineer's preparation of his own plans |
before
Entity1 is before Entity2 |
engineer passing judgment on (approving) those plans as city engineer |
time:intervalBefore
http://www.w3.org/2006/time#intervalBefore |
There is still left for decision, however, the practical question of the engineer passing on the ade... [more] |
| engineer's advice/recommendation to the city on a project |
before
Entity1 is before Entity2 |
city council approval of the project |
time:intervalBefore
http://www.w3.org/2006/time#intervalBefore |
the engineer has a duty because of his dual capacity to avoid prejudicing his advice to the city on ... [more] |
| city council approval of a project |
before
Entity1 is before Entity2 |
engineer securing a commission for that project |
time:intervalBefore
http://www.w3.org/2006/time#intervalBefore |
its approval by the city council may lead to his securing a commission for that project |
| client's waiver of its right to independent review |
before
Entity1 is before Entity2 |
engineer acting in dual capacity approving his own plans |
time:intervalBefore
http://www.w3.org/2006/time#intervalBefore |
The client has such a right of review by its own engineer, but it may waive its right, as it has obv... [more] |
About Allen Relations & OWL-Time
Allen's Interval Algebra provides 13 basic temporal relations between intervals. These relations are mapped to OWL-Time standard properties for interoperability with Semantic Web temporal reasoning systems and SPARQL queries.
Each relation includes both a ProEthica custom property and a
time:* OWL-Time property for maximum compatibility.